Beverley Leisure Centre Coffee Counter

Mar 01, 2021

A new coffee counter at the Beverley Leisure Centre.

Customer:

East Riding of Yorkshire Council



Project:

East Riding Leisure Beverley Cafe - February 2020



Brief:

We were approached by East Riding of Yorkshire Council’s senior catering manager for Leisure and Destinations and asked to design a concept to renew the existing counter. The counter was not only looking dated, the design made it difficult for the staff to maintain eye contact with any customers. ATL Was asked to design a free-flowing layout with modern visual impact and an open feel.



Design/Planning:

ATL Was asked to design a free-flowing layout with modern visual impact and an open feel. All design and planning works were conducted by ATL Commercial Kitchens alongside East Riding of Yorkshire Council’s senior catering manager for Leisure and Destinations.


To deliver this project whilst the Leisure Centre was in full operation meant that we had to create a segregated area for health and safety reasons to separate the customers and workers.


During initial meetings it was discussed what finishes would look best, it was agreed on Grey Silestone countertops and an off white panelling alongside contrasting pale grey UPVC wall cladding to give a modern crisp and contrasting finish.



Product Delivery:

ATL assigned an experienced and dedicated project manager to oversee the work and ensure all the client’s needs were met as far as quality and timescale.


ATL’s work brief consisted of:

 

  • Removal of existing counter.
  • Making good all wall floor and ceiling finishes with new additions to suspended ceiling and installation of hygienic wall cladding.
  • Installation of new Victor bespoke servery units.
  • The installation of new commercial vinyl flooring.
  • New LED lighting.
  • All plumbing and electrical works to complete the project.


Once completed the project manager conducted a meeting ensure the complete satisfaction of the client.

Customer feedback: ATL understood the brief, offered suggestions and delivered the project on time and with a minimum of fuss to the centre. Staff and customers love the new counter, and all agree it has improved the look and feel of the whole cafe area.


ATL completed the project in exactly 1.5 weeks and as usual delivered the project on time and cost.

Customer Feedback:

"ATL completed the project in exactly 1.5 weeks and as usual delivered the project on time and cost."


Senior Catering Manager

East Riding of Yorkshire Council

Gallery:
01 Mar, 2021
A replacement dishwasher at Tameside & Glossop Hospital.
the staff restaurant at the Siemens Gamesa factory in Hull
27 Feb, 2018
A staff restaurant refurbishment at the Siemens Gamesa blade factory, Hull.
More posts
Share by: